Interstate 485 (Georgia)


Interstate 485 (Georgia)


Interstate 485 (I-485) was a proposed auxiliary Interstate Highway that would have traveled eastward and then northward from Downtown Atlanta, in the US state of Georgia.

Route description

The 5.9-mile-long (9.5 km) route would have begun at the Downtown Connector (I-75/I-85) and used the highway that is now State Route 410 (SR 410) east to the interchange with the also-proposed SR 400. There, it would have turned north to end at I-85 near SR 236 (Lindbergh Drive). Each of those freeways would have continued beyond the termini of I-485. SR 410, the Stone Mountain Freeway, would continue east beyond the I-285 perimeter highway, and SR 400 would extend both south and north outside the perimeter. A short piece of I-485/SR 410 was constructed from I-75/I-85 east to Boulevard Northeast.

History

Activists in the neighborhood of Morningside, along the SR 400 portion of I-485, were the first to fight the road, although opposition surfaced in a number of nearby surrounding neighborhoods. This is the most famous example of the Atlanta freeway revolts. After I-485, and parts of SR 400 and SR 410, was canceled, a portion of the right-of-way of the canceled highway was used to build Freedom Parkway, now part of SR 10. SR 400 north of I-85 was constructed in the early 1990s as a toll road, and the section south of I-285 was constructed in the mid-1980s and designated I-675.

See also

  • Georgia (U.S. state) portal
  • U.S. roads portal
  • Transportation in Atlanta
  • Interstate 420

References

External links

  • Media related to Interstate 485 (Georgia) at Wikimedia Commons
  • Interstate 485 Georgia on Interstate-guide.com
  • The canceled I-485 route (superimposed on Google Maps)