Line 1 is a north–south line of the Shanghai Metro. It runs from Fujin Road in the north, via Shanghai Railway Station to Xinzhuang in the south. The first line to open in the Shanghai Metro system, line 1 serves many important points in Shanghai, including People's Square and Xujiahui. Due to the large number of important locations served, this line is extremely busy, with a daily ridership of over 1,000,000 passengers. Generally, the line runs at grade beside the Shanghai–Hangzhou railway in the south, underground in the city center and elevated on the second deck of the North–South Elevated Road in the North. The line is colored red on system maps.
The required investment for the project was US$620 million (including domestic supporting RMB investment). In August 1988 and May 1989, the program of loans to the Federal Republic of Germany, France and the United States was approved by the State Planning Commission.
With the start of construction of the project, the cost has also increased. In August 1993, the budgetary estimate was adjusted to 3.974 billion yuan, of which domestic supporting funds increased by 1.086 billion yuan. In January 1995, the total budget was adjusted for the second time to 5.39 billion yuan, of which 3.961 billion yuan was domestic supporting funds.
A 1.2 km (0.75 mi) extension to Humin road (North Xinzhuang Station) has been approved as part of the National Development and Reform Commission has approved the 2018-2023 construction planning of the city's Metro network. Work is expected to begin before 2023 and will take 4 years at acost of US$518. The extension will connect to the under construction Jiamin line.
As the first line in the system, Shanghai Metro was conceived and designed during 1980s, when fixed block signalling and track circuit based train control (TBTC) was still considered a state-of-art approach to automatic train operation. The signalling system was designed by CASCO, a signalling manufacturer owned jointly by China Railway Signal & Communication Group Corporation (CRSC) and General Railway Signal (GRS), and was largely based on the system designed by GRS for the Washington Metro. Coded audio-frequency (AF) track circuits are used for both train detection and transmission of speed commands, as well as limited train-to-wayside communication (TWC) for automatic train supervision (ATS). Train operation between stations and station stop can be automatic, while doors are controlled manually by train operators.
From 2013 to 2019, the system was completely renewed, with obsolete components such as relay interlockings replaced by modern microprocessor-based ones, but the general operation of the signaling system remained unchanged. As of 2020, the original design is expected to serve two additional decades.
In the summer of 2006 after poor cooling affected 16 DC01 trains on Line 1 in the summer, high temperatures inside the carriages had long been a problem, 96 ice cubes have been put into a one-meter-high waste container to alleviate the high temperature of the 16 DC trains on Line 1. In order to make up for the defects in the refrigeration power and design of the 16 DC trains, emergency measures must be taken whenever the temperature reaches 33 °C (91 °F) or more. With the transformation between 2006 and 2008 from 6 carriages to 8 carriages the air conditioners of the trains were improved and modernized, making ice waste containers a thing of the past.
The line was initially operated by trains built by the German Shanghai Metro Group which included Adtranz (now Bombardier) and Siemens together with AEG Westinghouse and Düwag.
All are Class A trains 8 cars in length.
All were 8-car Class A rolling stock.