Manohar International Airport (IATA: GOX, ICAO: VOGA), is an international airport at Mopa in Pernem Taluka, North Goa district in the state of Goa, India. It serves North Goa and the adjoining districts of Karnataka and Maharashtra, and as a second airport of Goa after Dabolim Airport in Dabolim.

The airport is developed by GMR Goa International Airport Limited (GGIAL), a special purpose vehicle (SPV). It is built at a cost of 3,000 crore (equivalent to 32 billion or US$380 million in 2023). In financial year 2023-24, the airport handled over 4.4 million passengers, which is close to its current maximum capacity of 4.5 million passengers per year. On an average, the airport handles around 100 aircraft movements and about 15,000 passengers daily. It is the fifteenth busiest airport in India. It is named after the former Minister of Defence and the former Chief Minister of Goa, Manohar Parrikar.

The airport was completed and opened on 11 December 2022, with operations starting from 5 January 2023 with the first flight operated by IndiGo. It was expected to be completed by the financial year 2019–2020, but was delayed due to a Supreme Court order that impeded work on site, and also due to the ongoing COVID-19 pandemic, which caused lockdowns, restrictions, and curfews, resulting in lack of labor and delays in construction.

The airport is built under the Build Operate Transfer (BOT) model in four phases, with the first phase costing a total of 1,500 crore (equivalent to 16 billion or US$190 million in 2023). The airport will cater to 4.4 million passengers in the first phase and 13.1 million by the end of the fourth phase. The concession period for the greenfield project is 40 years with a possible extension of another 20 years through a bid process and the revenue share payable by the concessionaire to the government is 36.9%. The airport will operate on a hybrid model with 30% cross-subsidy, and the concession offers 232 acres of land for commercial city-side development for a period of 60 years.

History

Goa's current airport at Dabolim is a civil enclave operated by the Airports Authority of India (AAI) at a military airfield, owned by the Indian Navy. Civilian and military operations share a common runway, resulting in severe airside congestion. This deters the long-term growth of civilian traffic at the airport.

It was Atal Bihari Vajpayee's flagship project. The Government of India had given its in-principle approval for a second airport in the state of Goa as early as March 2000. However, the project was stuck for 14 years due to land acquisition issues and local litigation.

The ICAO's techno-economic feasibility report submitted in 2013, that projected air traffic of 10 million passengers at Goa by 2035, eventually established the feasibility of the Mopa project. The Goa Government issued a Request for Qualification (RFQ) for the project in October 2014. Five bidders, GMR Group, GVK Group, the Airports Authority of India (AAI), Essel Infra and Voluptas developers expressed interest. Essel Infra partnered with Zurich Airports, and Voluptas Developers, which belongs to the Hiranandani Group tied-up with Vinci Airports, Rome, to bid for the airport project. On October 28, 2015, the Ministry of Environment, Forest and Climate Change granted environment clearance to the project. The Request for Proposal (RFP) for the project were issued in January 2016, seeking bids from interested companies to construct the airport. Two of the five companies that responded to the RFQ decided not to participate in the RFP. The bids were opened in August 2016. GMR Airports Limited, a subsidiary of GMR Infrastructure Limited won the competitive bid to develop and operate the airport. The Airports Authority of India emerged as the second highest bidder followed by the consortium of Essel Infra-Incheon. In October, GMR Airports Limited formed the Special Purpose Vehicle (SPV) called GMR Goa International Airport Limited (GGIAL) to raise funds for, design, construct, and run the project. GMR Airports Ltd signed a concession agreement with the Government of Goa on 8 November 2016.

In 2016, the State Government proposed to establish an Aviation Skill Development centre in order to provide employment opportunities at the airport to local youth. The concessionaire would be required to give preference to bona-fide Goans for all jobs at the airport. This Aviation Skill Development Centre was initially to be set up by the concessionaire either at the Pernem ITI campus or any other ITI centre. However, in 2020, the location of the proposed centre was shifted to the airport premises itself.

Project completion and Inauguration

Prime Minister Narendra Modi laid the foundation stone of the project on 13 November 2016. The State Government acquired 78.41 lakh square metres of land for the airport from villages of Casarvarnem, Chandel, Varconda, Uguem, and Mopa in Pernem taluka. In January 2017, the Goa Government declared an area within five km2 radius of the airport as 'Mopa International Airport planning area' for the purpose of regulating growth near the project area.

GGIAL and the Ministry of Civil Aviation (MoCA) signed a Memorandum of Understanding (MoU) in Delhi on 31 March 2017 for necessary support from the centre to develop the airport. The master plan of the airport was also reviewed and approved by Engineers India through a separate contract earlier in 2017. GGIAL invited tenders for the Engineering, Procurement, and Construction (EPC) contract in June 2017, which was awarded to Philippines-based Megawide Construction Corporation in February 2018.

The Goa Government finally put its stamp on the project by enacting "The Goa (Manohar International Airport Development Authority) Act, 2018" on 5 September 2018. Subsequently, the Union Home Ministry gave security clearance for the construction in October 2018. On 18 January 2019, the Supreme Court ordered the Goa Government and GGIAL to maintain status quo on the project due to environmental impact. Construction of phase 1 of the airport was underway when the top court had given its order. The Court allowed resumption of construction work at the project site in January 2020. 50% of the airport construction had been completed by 2021, and 90% had been completed by July 2022.

On 11 December 2022, the airport was inaugurated by Prime Minister Narendra Modi and renamed to Manohar International Airport after former Defence Minister and the 10th Chief Minister of Goa, Manohar Parrikar. It opened for domestic operations on 5 January 2023, with the first flight operated by IndiGo. Air India became the first airline to begin regular international flights from the airport to London Gatwick Airport from 21 July 2023.

The airport is code 'E' compliant, featuring a 3.5 kilometre long runway with Rapid Exit Taxiways. The airport has an Integrated Passenger Terminal Building, Air Traffic Control (ATC) building, meteorological facilities, a cargo terminal, ancillary facilities for processing and storage, aircraft rescue and firefighting services and infrastructure for aviation fuel.

Airlines and destinations

Accessibility

The airport is situated 8 km (5.0 mi) east of Dargalim off National Highway 66 (NH-66). A new national highway designated NH-166S is being built by NHAI to connect NH-66 with the airport. The 6.6 kilometre long, six-lane elevated corridor is being built at a cost of Rupees 770 Crore. It will allow passengers to access the airport from the highway junction within five minutes by bypassing local villages. The nearest railway head is Pernem railway station, on the Konkan Railway. Ride hailing services such as Uber and Ola Cabs are not available in the airport. The State-owned Kadamba Transport Corporation operates bus services to the airport from Panaji, Mapusa, and Margao.

The airport is to be directly connected with the nearby neighbouring districts of Maharashtra and Karnataka via the proposed Nagpur–Goa Expressway. The expressway, which begins at Nagpur will terminate at an interchange with NH-66 at Patradevi, located about 20 km (12 mi) north from the airport on the Maharashtra–Goa border.